Neural Network Estimation Model to Optimize Timing and Schedule of Software Projects

2021

Closed access Metadata (CSL-JSON)
DOI 10.1109/sist50301.2021.9465887
Data confidence 85 high
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

Software projects have a probability of high failure rates that appear to linger around 60% for significant IT projects. Estimating time and project schedule are crucial tasks and extremely influence the project outcomes. Artificial Intelligence now can provide multiple solutions for most problems of software projects. This article aims to develop a Neural Network estimation model to manipulate the problem of timing for software projects. The model can predict the estimation value of project time which optimizes the scheduling process, the developed model achieved high accuracy after testing through the test datasets.