Control of Telecommunication Network Parameters under Conditions of Uncertainty of the Impact of Destabilizing Factors

Information, 2024

Full text Open access: Gold Metadata (CSL-JSON)
DOI 10.3390/info15020069
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

The classification of the natural and anthropogenic destabilizing factors of a telecommunications network as a complex system is presented herein. This research shows that to evaluate the parameters of a telecommunications network in the presence of destabilizing factors, it is necessary to modify classical linear methods to reduce their sensitivity to the incompleteness of a priori information. Using generalized linear models of multiple regression, a combined method was developed for assessing and predicting the survivability of a telecommunications network under conditions of uncertainty regarding the influence of destabilizing factors. The method consists of accumulating current information about the parameters and state of the network, the statistical analysis and processing of information, and the extraction of sufficient sample statistics. The basis of the developed method was balancing multiple correlation–regression analysis with the number of regression equations and the observed results. Various methods of estimating the mathematical expectation and correlation matrix of the observed results under the conditions of random loss of part of the observed data (for example, removing incomplete sample elements, substituting the average, pairwise crossing out, and substituting the regression) were analyzed. It was established that a shift in the obtained estimates takes place under the conditions of a priori uncertainty of the statistics of the observed data. Given these circumstances, recommendations are given for the correct removal of sample elements and variables with missing values. It is shown that with significant unsteadiness of the parameters and state of the network under study and a noticeable imbalance in the number of regression equations and observed results, it is advisable to use stepwise regression methods.