Assessment of the Service Status of the Tunnel Structure Adjacent to the Station

2023

Full text Open access: Gold Metadata (CSL-JSON)
DOI 10.3233/atde230863
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

To assess the operational reliability of the tunnel structure adjacent to Metro Line 1 station during its active service, we conducted a comprehensive investigation. This investigation involved the detection and precise measurement of four significant structural concerns within the tunnel: water infiltration, segment misalignment, exposed joints, and lining fractures. We conducted a detailed analysis of the spatial distribution patterns of these structural issues along both the longitudinal and circumferential axes of the intermediate tunnel section. Additionally, we conducted an assessment of the operational condition of segment components and connecting bolts, adhering to established standards. This comprehensive approach allowed us to achieve a thorough evaluation of the overall operational condition of the tunnel.