USE OF TEPHRITOBASALT AND LEAD SLAG AS AN ALTERNATIVE RAW MATERIAL IN BURNING PORTLAND CEMENT CLINKER

2023

Full text Open access: Gold Metadata (CSL-JSON)
DOI 10.51488/1680-080x/2023.2-18
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

The main raw materials in the production of cement are carbonate and clay rocks, as well as some types of industrial and man-made waste. The bowels of Kazakhstan are rich in raw materials for the production of cement, but the reserves of high-quality natural raw materials are limited. In Kazakhstan, according to the Committee of Geology, 122 limestone deposits have been explored with a total balance of reserves of 480.2 million tons. Deposits of clay rocks are known in all regions of Kazakhstan. 1500 deposits of clay rocks have been explored. In addition, in many regions of the Republic there are multi-million dumps of industrial and man-made waste. Currently, the volume of accumulated industrial waste is more than 30 billion tons. The aim of our research is to study the possibility of using tephrite-basalt and lead slag as a substitute for the clay and iron-bearing component during clinker firing in the production of Portland cement.