PRODUCTION ACTIVITIES OF THE STATE SEWING FACTORY “BOLSHEVICHKA” IN KOSTANAY IN 1942

2023

Full text Open access: Hybrid Metadata (CSL-JSON)
DOI 10.54596/2309-6977-2022-4-50-54
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

As a result of the threat of German occupation of the western regions of the USSR, the state leadership decided to evacuate the population and strategically important enterprises to the eastern regions. In the summer[1]autumn of 1941, the Bolshevichka factory was evacuated from Kherson to Kostanay. From the moment of arrival at a new destination, the process of reorganization of the work of the factory team begins. Based on archival materials, the article examines the systematization of the factory during this period.