Inspection and Preparation for Testing of the Road Overpass of the Almaty-Kapshagai Highway after the Vehicular Impacts

Communications - Scientific letters of the University of Zilina, 2022

Full text Open access: Gold Metadata (CSL-JSON)
DOI 10.26552/com.c.2022.4.d160-d173
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

The 33.0 m long reinforced concrete bridge beams of the overpass superstructure after vehicular impacts were taken as a research object. The overpass consists of 14 beams, six of which were repaired by restoring the widened lower part with EMACO FAST TIXO, manufactured by BASF. The remaining 8 beams were completely dismantled and replaced with new ones. The new beams have been fully tested for the perception of vehicular loads. The fully reconstructed span structure showed compliance with the design loads of A14, NK-120 and NK-180 based on test results.