КОНЦЕПТУАЛЬНЫЙ ПОДХОД К РАЗРАБОТКЕ МЕТОДОВ ПРОГНОЗИРОВАНИЯ ОПТИМАЛЬНОГО ВРЕМЕНИ РАБОТЫ ДОЛОТА

2021

Closed access Metadata (CSL-JSON)
DOI 10.37878/2708-0080/2021-6.05
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

В статье приводятся последовательность и результаты анализа геолого-технологической информации о бурении скважин, показаны пути принятия концептуального решения по выбору наилучших типов долот и режимных параметров. При этом используется два критерия: рейсовая скорость и стоимость метра проходки с применением положений теории нечётких множеств. Результаты выполненных исследований при наличии предварительных показателей работы долота, позволяющих строить в различной степени однотипные математические модели, принимаются как базовые с возможностью развития. Однако при конкретных геологических условиях практическое применение этих моделей было затруднено вследствие специфических особенностей рассматриваемых условий, различного рода неопределенностей, неоднородности геологического разреза. Последнее обусловило необходимость расчленения геологических разрезов методами математической статистики на пачки одинаковыми категориями буримости горных пород.