Substantiation of uranium mining by ISL based on a geotechnological modeling

2019

Full text Open access: Gold Metadata (CSL-JSON)
DOI 10.1088/1742-6596/1399/2/022001
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

Abstract This article focuses on the use of geo-technological modeling techniques for mine planning and optimizing the extraction of uranium reserves. In the course of the research, there is calculated a time to achieve 80% of the extraction of uranium from each predictive block within an ore-body. These results of uranium mining are analyzed for the entire field based on an annual uranium extraction from each settlement block, taking into account a target total production, the productivity of factory for the enrichment of productive solutions and requirements for the concentration of uranium in working solutions.