BISMUTH TELLURID WASTE PROCESSING

2017

Full text Open access: Gold Metadata (CSL-JSON)
DOI 10.32362/2410-6593-2017-12-1-39-44
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

The main stages of bismuth telluride processing comprising sintering with NaOH, leaching and precipitation were investigated. Bi2Te3 samples produced by "ADV Engineering" were used as starting compounds. The studies revealed regularities of tellurium behavior during the sintering of Bi2Te3 with NaOH and the resulting the solid residue leaching. It was noted that annealing at 350-450°C with NaOH transforms tellurium into Na2TeO3, which is an appropriate form for further dissolution and separation from bismuth. Increasing temperature results in Na2TeO3 oxidation and formation of the water-insoluble compound Na2TeO4. Thus, it decreases tellurium extraction degree during the leaching. It has been shown that increasing temperature from 8 to 25°C at the step of tellurium hydrolytic precipitation slightly affects the extraction degree, the value of which is 93.5-98.2%.