Topo-geodesic works during the construction of the road «Almaty-Khorgos»

2015

Full text Open access: Hybrid Metadata (CSL-JSON)
DOI 10.26577/jgem.2015.2.243
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

Геодезиялық жұмыстар құрылысты жобалаудың, салудың және құрылыс өндірісінің айырылмас бір бөлігі. Осы мақалада «Алматы-Қорғас» жол құрылысындағыгеодезиялық жұмыстардың мазмұны және технологиялық тізбегі, жұмыс реті, сатылары және негізгі технологиялық өндірісі ашылған. Осы жолдың құрылысындағыгеодезиялық жұмыстарды ұйымдастыру, жол мен құрылымдарды дұрыс және нақтылы жер бетіне орналастыру, олардың құрамдық және пландық элементтерін геометриялық пішіндеріне, нормативтік талаптарына сай өлшеу, есептеу және сызбаларды құрастыру, сонымен бірге жер бетіне түсіру үшін жасалатын үрдісті құрамды үлкен жұмыстар көрсетілген. Қазіргі заманғы геодезиялық әдістерге шолу жасай отырып, тиімді жолдары да қарастрылған.