Automation of control systems of data processing of geodetic measurements on construction objects

2016

Full text Open access: Hybrid Metadata (CSL-JSON)
DOI 10.26577/jgem.2016.2.328
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

The article discusses the gas pipeline«АGRS-3 “Talgar” – GRP-“Gulder” – AGRS-1 “Orbita”». As a result of a research we will see on the basis of the carried-out geodetic works scientific and practical justification of results of geodetic monitoring is the main objective.It will be shown results and features of a research of deformation processes in case of a construction of a trunk gas pipeline «АGRS-3 “Talgar” – GRP-“Gulder” – AGRS-1 “Orbita”», using innovative technologies in case of identification of deformations.Satellite navigation when determining location of defects of a linear part of the main gas pipelines on the basis of a geodetic arrangement is applied.In case of the choice of the route construction conditions were considered to provide application of the most effective, economic and high-productive production methods of installation and construction works. Weren't allowed laying of bulk distribution lines on the territories of settlements, industrial and agricultural enterprises, airfields, railway stations, piers and other similar objects.In case of the choice of the route of the pipeline perspective development of the cities and other settlements, industrial and agricultural enterprises, iron and highways and other objects and the projectible pipeline for the next 20 years were considered, forecasting of changes of an environment in the course of a construction and operation of bulk distribution lines was executed.