The combined method for assessing risk factors in underground construction

2020

Full text Open access: Gold Metadata (CSL-JSON)
DOI 10.33271/nvngu/2020-3/053
Data confidence 85 high
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

The CoMBineD MeThoD for aSSeSSinG riSK faCTorS in unDerGrounD ConSTruCTionPurpose.Development of a combined method for qualitative and quantitative assessment of risk factors accompanying the construction and operation of underground constructions based on expert analysis and mathematical modeling by numerical methods. Methodology.When creating a comprehensive method for ranking the underground construction route by the degree of prob lems, we used methods of expert assessment, statistical analysis and mathematical modeling, which allow us to assess the state of each section by summing the points of risk factors assessment. findings.Based on the results of practical application of the developed method for ranking the Almaty metro route sections by the degree of problems, the method has shown its effectiveness in solving the problems of ensuring the safety of construction and operation of the metro and has been adopted for implementation.originality.Assessment of the condition of the underground construction route section according to the degree of problematic ity in accordance with the principle of adding risk factors through conditional points established by the results of expert analysis and mathematical modeling. Practical value.The method improves the effectiveness of monitoring the state of the underground construction route, im proves the quality of situational control as well as the forecast of the manifestation of risk situations and their development.The method can be used for solving similar problems in underground construction of different objects, including the development of mineral deposits.