Abstract
The article provides results of calculation studies of the IGR reactor temperature field under long-term and short start-up with integral power of 5.2 GW with subsequent cooling down of the reactor. It is shown that during long start-up which takes more than one hour it is possible to exceed the declared maximum integrated power of the reactor without disfunction of its operating temperature limits.