Project management in the construction industry of the Republic of Kazakhstan: maturity level analysis

2023

Full text Open access: Gold Metadata (CSL-JSON)
DOI 10.46914/1562-2959-2023-1-4-334-345
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

If we consider the construction market as a type of economic activity, the market provides for the creation of objects, measures for their restoration. The project has goals, prerequisites for implementation and takes into account the individual characteristics of both the project and the construction site. The basis for effective and high-quality project implementation is an effective project management system. Currently, in the organizations of the construction industry, the most widespread project-oriented management approach. More and more construction organizations, in order to quickly and timely respond to emerging changes, come to the realization of the need to standardize project management processes. The purpose of the study is to analyze the level of maturity of construction companies in the Republic of Kazakhstan. For this, an adapted Berkeley model was used to assess the maturity of project management in construction companies of the Republic of Kazakhstan, on the basis of which the intensity of the use of project management processes in construction projects was analyzed. In the article, depending on the tasks to be solved, methods of scientific abstraction, system analysis, comparative analysis, models of the project management maturity level, a quantitative survey method, etc. are used. The novelty and result of the study is the adapted Berkeley project management maturity model, combined with the processes of the PMBOK international project management standard, to assess the maturity of project management in the construction sector of the Republic of Kazakhstan.