Assessment of the stability of the underworked sides and ledges of the quarry to determine the area of possible location of the shaft

2022

Full text Open access: Gold Metadata (CSL-JSON)
DOI 10.31643/2023/6445.20
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

As known, the main methods of developing solid minerals are open and underground methods. However, an analysis of the world’s practice of developing deposits of solid minerals also indicates the widespread use of the combined method of development in the last 50-60 years. Combined development of deposits at domestic and foreign mining enterprises is used due to the variable depth of deposits, which is typical mainly for deposits of steep and inclined fall. The essence of the combined development is that the upper horizons are developed in an open way, and the lower ones are developed underground. In such deposits, the following scheme has become widespread: the initial development of the upper section of the deposit by a shallow quarry (up to a depth of 80-100 m, sometimes more), then the construction of an underground mine, carried out in parallel with the completion of the quarry reserves. When opening sub-quarry reserves subject to underground mining, the resulting quarry space can be used. The penetration of vertical and inclined opening workings, tunnels, and exits from the berm sides or directly from the bottom of the quarry has become widespread. In parallel mining of reserves by open and underground methods, the joint use of transport workings is widely used for the delivery of ore mass from the quarry and underground mine, the placement of an underground crushing complex, auxiliary, and repair facilities in the quarry itself. In addition, the method of refining sub-quarry reserves with the opening of the underground part outside the quarry space has been widely used. After the end of open-pit mining, underground horizons are opened by capital mining workings (vertical, inclined shafts, tunnels).