Clash Detection Using Building Information Modeling (BIM) Technology in the Republic of Kazakhstan

Buildings, 2022

Full text Open access: Gold Metadata (CSL-JSON)
DOI 10.3390/buildings12020102
Data confidence 85 high
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

Research on the digital built environment in the context of identifying and minimizing clashes is a critical area to investigate owing to the significant influence of clashes on the construction process. This research aims to identify the current state of building information modeling (BIM) enabled clash detection in the architecture, engineering, and construction and operation (AECO) industry of the Republic of Kazakhstan. It further identifies the main reasons for clash occurrence, methods, and practices used to decrease the workload on BIM project teams. It also recognizes the existence of BIM departments (their type and functionalities). It aims to answer whether the transition from clash detection to clash avoidance is possible in a country where BIM technology has just penetrated. This research conducted a literature review and review of current regulatory documents regarding BIM technology, interviews with industry professionals, and a survey among construction companies and design organizations. Although the AECO industry of Kazakhstan has just entered the BIM environment, this research has shown that BIM-enabled clash detection and resolution processes are trying to evolve in parallel. It was concluded that the transition is difficult in a country where document assistance with clash detection and resolution is not well developed.