Routing Flow-Shop with Buffers and Ready Times – Comparison of Selected Solution Algorithms

2014

Full text Open access: Gold Metadata (CSL-JSON)
DOI 10.2478/mper-2014-0033
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

Abstract This article extends the former results concerning the routing flow-shop problem to minimize the makespan on the case with buffers, non-zero ready times and different speeds of machines. The corresponding combinatorial optimization problem is formulated. The exact as well as four heuristic solution algorithms are presented. The branch and bound approach is applied for the former one. The heuristic algorithms employ known constructive idea proposed for the former version of the problem as well as the Tabu Search metaheuristics. Moreover, the improvement procedure is proposed to enhance the quality of both heuristic algorithms. The conducted simulation experiments allow evaluating all algorithms. Firstly, the heuristic algorithms are compared with the exact one for small instances of the problem in terms of the criterion and execution times. Then, for larger instances, the heuristic algorithms are mutually compared. The case study regarding the maintenance of software products, given in the final part of the paper, illustrates the possibility to apply the results for real-world manufacturing systems.