Experimental Studies of the Developed Method for Determining the Insulation Parameters in an Asymmetric Network by a Voltage up to 1000 V at Mining Enterprises

2020

Full text Open access: Gold Metadata (CSL-JSON)
DOI 10.1051/e3sconf/202022001032
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

In the work experimental studies of the developed method for determining the insulation parameters in an asymmetric electrical network by a voltage up to 1000 V at mining enterprises were carried out. It is based on measuring the module values of line voltage, angle of phase shift between vectors of damaged phase voltage relative to the ground and line voltage at two other phases, as well on measuring the module value of damaged phase voltage relative to the ground before and after connecting additional capacitive conductivity between the network’s phases and the ground. The results of experiment showed that the developed method for determining the insulation parameters has satisfactory accuracy and safety when operating three-phase electrical networks by voltage up to 1000 V at mining enterprises.