Improving project cost forecasts: an analysis of combining unsupervised and supervised machine learning algorithms with real project data

2026

Closed access Metadata (CSL-JSON)
DOI 10.1108/bpmj-10-2025-1592
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

Purpose This study aims to develop a new hybrid algorithm that combines supervised and unsupervised ML techniques to improve the precision of predictions for project progress and cost performance measures. Design/methodology/approach This study utilizes a hybrid project cost forecasting methodology by combining supervised and unsupervised machine learning algorithms. Findings Computational results of this study demonstrate the superiority of the XGBoost and Random Forest algorithms, both ensemble methods, and confirm the accuracy of this forecasting methodology. Originality/value Unlike earlier studies that rely on artificially generated data, this study uses a dataset of 117 real-world projects to test the new forecasting technique. The clustering approach to the cost dataset, a novel contribution of the current study, demonstrates enhanced prediction accuracy. Cluster-aware estimate-at-completion forecasting is studied as a process-level decision-support tool.