Hydromechanical Behaviour and Reinforcement Performance of Railway Embankments Under Seasonal Inundation: A Laboratory Investigation and Numerical Modelling

2026

Full text Open access: Gold Metadata (CSL-JSON)
DOI 10.3390/geotechnics6010010
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

Seasonal groundwater rise of 2.5–3.0 m leads to full saturation of the lakeside slope of the railway embankment, significantly reducing the strength of clayey–sandy loam layers. Laboratory shear tests showed that saturation decreases the internal friction angle from 24–26° to 16–19°, while effective cohesion drops from 12–18 kPa to 0–3 kPa, identifying the 3–6 m depth interval as the critical weak zone. These parameters were incorporated into PLAXIS 2D/3D hydro-mechanical models to assess the embankment behaviour under three scenarios: natural conditions, high water level, and reinforced configuration. Under elevated water levels, lateral displacement toward the lakeside increased to 0.16–0.21 m, and the plastic strain zone expanded by a factor of 2.4, reducing the safety factor from FS ≈ 1.32 to below 1.10. The proposed stabilization system—replacement of a 1.5 m weak layer, installation of geotextile reinforcement, and application of a bituminous waterproofing layer—substantially improved stability, reducing maximum lateral displacement to 0.12 m (≈43% reduction) and restoring the safety factor to FS = 1.25–1.40. The results demonstrate that low-cost geosynthetic barriers provide an effective and practical engineering solution for maintaining the long-term stability of railway embankments exposed to seasonal inundation.