THE ADOPTION OF PROJECT MANAGEMENT PRACTICES BY A LOCAL GOVERNMENT IN KAZAKHSTAN: BARRIERS AND SOLUTIONS

2023

Full text Open access: Gold Metadata (CSL-JSON)
DOI 10.13165/vpa-23-22-4-12
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

The introduction of project management is increasingly perceived as a response to the declining performance of governments and ineffective programs. The goal of this article is to identify barriers to the implementation of project management tools in a local government in Kazakhstan and develop solutions for their mitigation. In-depth interviews and document analysis were utilized as research methods. Overall, the adoption of project management was evaluated as poor. The analysis uncovered four major hindering factors. The first barrier was an ineffective change strategy when bringing about this reform. Secondly, it was revealed that real changes in the government’s management approaches were overshadowed by technical aspects of the project management adoption policy. Thirdly, project management methods were not tailored to the specifics of the government. The final obstacle was the ill-conceived distribution of responsibilities among government employees, which caused coordination and interaction issues. This paper contributes to the empirical enhancement of the existing body of knowledge on management reforms in the public sector.