Techno-Economic Analysis of the Modernization Options of a Gas Turbine Power Plant Using Aspen HYSYS

Energies, 2023

Full text Open access: Gold Metadata (CSL-JSON)
DOI 10.3390/en16062704
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

Currently, 90% of Kazakhstan’s oil is situated in 15 oil and gas fields where simple cycle gas turbines are utilized for electricity generation. The need for developing techniques to enhance the efficiency and eco-friendliness of fuel consumption in Kazakhstan’s oil fields is imperative. In this article, methods for improving the energy efficiency of a simple gas turbine power plant functioning in an oil field are discussed, with consideration given to the impact of ambient temperature and specific environmental constraints, such as water scarcity and high temperatures. Two schemes to increase efficiency are evaluated: the first involves the utilization of a waste heat boiler for steam production intended for technological purposes, while the second involves electricity generation through a combination of a waste heat boiler and a steam turbine. Models based on Aspen HYSYS were formulated, with actual gas turbine power plant operation taken into account. Analysis indicated that a waste heat boiler scheme could generate up to 350 t/h of steam, completely replacing power boilers. Im plementation of the combined cycle power plant (CCPP) system resulted in the production of up to 262.42 MW of electricity. Environmental analyses demonstrated that both schemes exhibit comparable specific emissions in terms of power generation, with 0.56 kgCO2/kWh for HRSG and 0.53 kgCO2/kWh for CCPP. Technological, environmental, and economic analyses were conducted to determine the most promising technology, considering the specifics of the oil fields in Kazakhstan. Based on the payback period for HRSG (4 years) and CCPP (7 years) options, it was deduced that the former is the most favorable for implementation