Production of Complex Calcium-Containing Ferrous Alloys of Waste Smelter Slags and High-Ash Coals

2019

Closed access Metadata (CSL-JSON)
DOI 10.3103/s0967091219100085
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

Abstract Based on studies, the technological process results of the production of a complex calcium-containing ferrous alloy of waste blast-furnace slag using high-ash coal from the Saryadyr coal field and coal slurry from the Karaganda coal basin are presented. The study was conducted on the experimental site of the Abishev Chemical Metallurgical Institute using an ore-smelting furnace equipped with a 200-kV A transformer. The main task of the study was ensuring the complete reduction of all oxides of the charge comprised of blast-furnace slag, high-ash coal, and coal slurry in a continuous, stable, and easy-to-control slagless process.