Empirical relationship for drilling rate in hard rock underground mines

2021

Full text Open access: Gold Metadata (CSL-JSON)
DOI 10.1088/1755-1315/833/1/012135
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

Abstract A reliable estimate of the drilling rate is essential in a successful drill and blast planning and mine production. Owing to this importance, numerous empirical equations of the drilling rate using the rock mass properties and the machine parameters have been proposed. However, these existing equations cannot be used in all site conditions. Hence, this paper aims to develop an empirical model for drilling rate estimation in hard rock mining. The data used for this study were collected from an underground mine located in Selibi-Phikwe, Botswana and included in-situ drilling rate, drilling machine specification and rock mass properties. Nonlinear regression model was used to derive the drill rate model. The result indicates high correlation between the estimated and the actual drill rates. In addition, it was found that the uniaxial compressive strength of the rock, the angle between the rock mass discontinuity planes and the drilling direction are the parameters impacting the drill rate the most. Also, the presence of quartz in the rock indicated good predictability of the drill rates.