Solving Multi-Objective Machine Scheduling Problem Using the Meerkat Clan Algorithm

2025

Full text Open access: Gold Metadata (CSL-JSON)
DOI 10.33095/0ss7v861
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

Machine scheduling problems have become increasingly complex and dynamic. The complexity and size of the problems require the development of methods and solutions whose efficiency is measured by their ability to find acceptable results within a reasonable amount of time. Therefore, this paper addresses to propose a new mathematical model for multi objective function based on Single-machine scheduling problems by minimizing the discounted total weighted completion time the number of tardy jobs the maximum earliness and the maximum weighted tardiness with release date denoted + which are an NP-hard. To achieve efficient solutions, a metaheuristic method (Meerkat clan algorithm (MCA)) is used to solve the mathematical model and compare it with branch and bound (BAB) method. Computational results show that MCA provides efficient solutions in terms of accuracy and calculation speed compared to BAB. In addition, the BAB can solve up to 10 problems, while MCA can resolve problems up to 1000 for multi objective.