Potential efficacy and application of a new statistical meta based-model to predict TBM performance

2021

Closed access Metadata (CSL-JSON)
DOI 10.1080/17480930.2021.1878087
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

This study constructs and verifies a new statistical meta based-model to predict tunnel-boring machine (TBM) performance, namely, polynomial chaos expansion (PCE). To test the validity of the proposed PCE, two well-known mathematical models, namely, response surface method (RSM) and multivariate adaptive regression spline (MARS) were developed. According to the results, it can be found that the PCE model, with a coefficient of determination (R2) of 0.843, was superior in comparison with the RSM and MARS models as well as those formerly presented in the literature for the same database and rock conditions.Abbreviations: ANFIS: Adaptive Neuro-Fuzzy Inference System; ANN: Artificial Neural Networks; AR: Advance Rate; BI: Rock Brittleness; BTS: Brazilian Tensile Strength; CP: Cutterhead Power; CT: Cutterhead Torque; d: Modified Agreement Index; DNN: Deep Neural Networks; DPW: Distance between Planes of Weakness; ICA: Imperialist Competitive Algorithm; MAE: Mean Absolute Error; MARS: Multivariate Adaptive Regression Spline; NSE: Modified Nash and Sutcliffe Efficiency; NTNU: Norwegian Institute of Technology; PCE: Polynomial Chaos Expansion; PR: Penetration Rate; PSI: Point Strength Index; PSO: Particle Swarm Optimisation; R2: Coefficient of Determination; RF: Random Forests; RMR: Rock Mass Rating; RMSE: Root Mean Square Error; RQD: Rock Quality Designation; RSM: Response Surface Method; RSR: Rock Structure Rating; SE: Specific Energy; SVR: Support Vector Regression; TBM: Tunnel-Boring Machine; TF: Thrust Force; UCS: Uniaxial Compressive Strength; WZ: Weathering Zone; α: Planes Of weakness.