An Assessment of Financial Stability of Artificial Intelligence-based Monitoring Project in Kazakhstan

2025

Full text Open access: Gold Metadata (CSL-JSON)
DOI 10.47703/ejebs.v69i2.507
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

Today, public-private partnership (hereinafter – PPP) projects, which apply digital technologies and artificial intelligence (hereinafter – AI), are becoming essential for improving infrastructure delivery and transparency. This study aims to assess the financial stability and risks of the Sergek project, an AI-based traffic video monitoring system in Almaty implemented under the PPP model with fixed government payments. The study examines the macroeconomic and operational risks of the project using system dynamics (SD) modeling. The data inputs for the SD model were collected from project documentation, national economic statistics, and expert interviews. In the baseline scenario, with a stable exchange rate (0.1% growth per year) and timely government payments, the internal rate of return (hereinafter – IRR) increases from -1.0% in 2021 to 0.37% by 2026. In an alternative scenario with an annual devaluation of 20%, the IRR only reaches 0.3%, and the break-even point is delayed by one year. However, the return significantly declined under scenarios simulating currency depreciation, underscoring the AI project’s sensitivity to external economic risks. This study provides methodological and practical contributions to the field, specifically within the contracts of availability-payment mechanisms in emerging economies like Kazakhstan. The proposed simulation model is an adaptable tool for stakeholders to forecast investment outcomes and enhance project monitoring and control based on AI applications in PPPs.