Configurations of 6-10 kV cable lines and types of cable damages

2021

Closed access Metadata (CSL-JSON)
DOI 10.1063/5.0047154
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

The article discusses the principles of electrical circuits formation and includes analysis, which showed that two-way feed ring and trunk networks are the most promising and efficient in technical and economic terms. It has also been found that, currently, in a closed configuration network in the normal operating mode of a network with two power sources, one of the lines must be disconnected. This is due to the impossibility to selectively trip a damaged line, in particular, with single phase-to-earth fault (SEF). It describes that the SEF is the main type of electrical damage in 6-10 kV cable networks.