Using PRINCE2 in the Development of Financial Monitoring Systems: An Empirical Assessment of AML/CFT Governance in Kazakhstan and Türkiye

International Journal of Economics and Project Management, 2026

Full text Open access: Gold Metadata (CSL-JSON)
DOI 10.66608/2617-085x.2026.3.3.011
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

This paper examines the applicability of the PRINCE2 project management methodology to financial monitoring systems (FMS) development and proposes a hybrid governance framework integrating agile elements. Building on a conceptual analysis and literature synthesis of studies published between 2021 and 2026 on the governance of projects in the financial domain, this extended version supplements the original conceptual contribution with empirical statistical material drawn from Kazakhstan's 2025 National Risk Assessment (NRA) of money laundering, the Eurasian Group (EAG) 2023 Mutual Evaluation Report, and Türkiye's Financial Crimes Investigation Board (MASAK) compliance statistics and FATF mutual evaluation outcomes for 2021–2025. The applicability of PRINCE2 is demonstrated through two illustrative national case studies: the modernisation of Kazakhstan's real-time transaction-monitoring infrastructure following its 2022–2024 FATF increased-monitoring episode, and Türkiye's large-scale MASAK compliance-examination programme conducted in 2025 in preparation for a post-delisting FATF on-site verification visit. The empirical evidence shows that product-based planning, stage-gate governance, and the four core PRINCE2 management products (Risk Register, Quality Register, Issue Register, Business Case) map directly onto the regulatory reporting and supervisory-examination cycles documented in both jurisdictions, while the iterative nature of machine-learning-based fraud-detection model development remains structurally incompatible with single-pass, waterfall-style PRINCE2 stage planning – a tension resolved through the hybrid PRINCE2-Agile approach proposed herein. The paper additionally situates its contribution within the Financial Forensics research agenda by linking PRINCE2 governance artefacts to the evidentiary and audit-trail requirements of suspicious-transaction investigation.