Assessment of the effectiveness of CAPEX/OPEX associated with the modernization of process facilities within the framework of the development of Field X

2026

Full text Open access: Gold Metadata (CSL-JSON)
DOI 10.54859/kjogi108952
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

Background: The expiry of the design operating life of the production facilities at Field X requires an assessment of the cost-effectiveness of capital expenditures (CAPEX) and operating expenditures (OPEX) associated with the modernization of process facilities, as well as the development of recommendations for optimizing investment decisions, considering the forecast decline in production and the prospects for further field development. Aim: To assess capital and operating expenditures associated with the modernization of the Phase 2 process facilities in the post-contract period. Materials and methods: The study is based on data from the Field X Development Project and Field Development Analysis (FDA). As part of the work performed, a model of the main Units 1 and 2 was developed using QUE$TOR software to compare the cost of their potential replacement with the results presented in the previously approved project documentation. The modelling was performed based on the current production capacities of the units. Results: The option involving the extension of the production plateau using a single liquid hydrocarbon (LH) process train with a capacity of 2.8 million tonnes per year was selected as the most optimal, based on the duration of maintaining the production plateau duration (7 years). Reducing the wellhead pressure of Unit 3 wells from a high to a medium level had a significant impact on increasing LH production, extending the production plateau by an additional 5 years. Conclusion: The proposed concept was recognized as technically feasible and economically justified. Infrastructure optimization makes it possible to reduce capital expenditures by USD 2.97 billion, achieve additional LH production of approximately 8 million tonnes, extend the production plateau by 12 years, and extend the gas export period by 7 years.