Minimizing the supply temperature at the district heating plant – dynamic optimization

2019

Full text Open access: Gold Metadata (CSL-JSON)
DOI 10.1051/e3sconf/201911802004
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

The constraint contains two elements, namely the heat losses and the electricity consumption for pumping at the producer. The aim was to achieve the lowest acceptable costs in an operation. The options with the supply temperature at the area starting point set to 80/60, then 60/40, and eventually 50/30 (low temperature, 4th generation district heating) were tested. The balance between the savings due to lower heat losses and the electricity consumption of pumps could be performed to assess the economic viability of the solution. This means that if the electricity price is sufficiently high, the model will always choose to minimize electricity consumption and thereby, maximise the profit from high temperature difference. Results concerning heat losses consider both experiences of proper insulation of pipes with variety of design outdoor temperatures (DOTs) and long term measurements from a pump station for district heating (DH) network in Canberra, Australia. We also noted that the heat energy tariffs and purchase price of electricity affect a lot optimal configuration of a DH system. For the best scenario, solutions are obtained that reach over 12% of the available saving potential after calculating 11 equations. Knowing that the policy is updated on a case study base, this is considered a promising result.