Effective Control and Management of Pump Station Electrical Equipment

2026

Full text Open access: Gold Metadata (CSL-JSON)
DOI 10.33166/aetic.2026.02.004
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

This study presents an integrated methodological framework for optimizing the control and management of electrical power equipment in municipal pump stations through the combined application of SCADA architecture and adaptive variable frequency drive (VFD) regulation. Unlike conventional approaches based on fixed operational set-points or isolated equipment-level upgrades, the proposed framework enables system-level evaluation of energy efficiency, hydraulic stability, operational reliability, and fault response performance. A mathematical model of pump station operation was developed in MATLAB/Simulink, incorporating key variables such as energy consumption, pipeline pressure, volumetric flow rate, shutdown frequency, and fault recovery time. The framework was validated using real operational data from three municipal pump stations in Taraz, Kazakhstan, representing heterogeneous infrastructure conditions. The results demonstrate a reduction in electrical energy consumption by 15-20%, a decrease in pump shutdown frequency by 50-70%, and a reduction in mean fault recovery time from 4-6 hours to 1-2 hours. In addition, the system reliability coefficient increased from 0.75-0.89 to 0.95-0.98. The simulation results showed strong agreement with field data, with model prediction errors not exceeding 6-8% for key operational parameters. Economic analysis indicates a payback period of approximately 2.2-2.5 years following modernization. The proposed framework provides a transferable decision-support methodology for evaluating and implementing energy-efficient and reliability-oriented control strategies in municipal water supply systems, particularly for aging infrastructure operating under variable hydraulic conditions.