Reduction of Energy Underdelivery at Nuclear Power Plants by Enhancing the Reliability of 3/2 Schemes

2025

Closed access Metadata (CSL-JSON)
DOI 10.1109/icieam65163.2025.11028469
Data confidence 70 medium
How this score is calculated

It is built from checkable properties of the record itself: whether the article has a DOI, how many independent sources confirmed its data, whether the required fields are filled in, and how recent the latest confirmation is. Disagreement between sources and a missing identifier lower it. A value of 80 or above means the record was published without further checking; 60 to 79 means it is published at reduced confidence, with a manual check advisable. A record verified by an editor by hand is never pushed below 90 by a recalculation. This scores our data about the article, not the article itself.

Abstract

This paper examines two possible approaches to improving the reliability of switchyard schemes at power plants. The first approach involves enhancing the relay protection of connections by implementing redundancy based on the “voting” principle. It is emphasized that to achieve the maximum effect in reliability improvement, redundant protection systems should be based on principles different from traditional protection methods. One potential approach to implementing protection on a novel basis is the use of reed switches, which, in addition to addressing the primary task, enables significant savings in copper, steel, and insulation materials by eliminating the need for metal-intensive current transformers. The second approach to reliability enhancement involves the mathematically justified introduction of additional circuit breakers into switchyard schemes. It is noted that this measure increases the reliability of isolating a faulted element from the scheme and reduces emergency-related energy underdelivery. As a case study, the implementation of an additional circuit breaker in the 3/2 switchyard scheme of the Rostov Nuclear Power Plant is considered. Specifically, the study examines the introduction of a supplementary circuit breaker between the transformer of each unit and its two high-voltage-side circuit breakers. A fragment of the computational tables based on Guk's tabular-logical method is presented, along with the results demonstrating a reduction in emergency energy underdelivery.