Аңдатпа
The article presents the results of full-scale static tests of two reinforced concrete columns arranged in different parts of a public building, the reliability of which was doubted due to the careless manufacture of concrete cubes before sending them for laboratory tests. Based on the doubts that arose, the construction of the object under construction was suspended with the requirement of convincing proof of the operational reliability of these load-bearing structures.