Аңдатпа
The authors discuss the technology for dual pumping technology of oil-producing wells and show its advantages and shortages. It is concluded that the simultaneous-separate oil production project proposed is economically attractive due to increment in oil production, high income terms and short pay-off period even in small and depleted reservoirs. Furthermore, the potential of the proposed project is evaluated in terms of the required facilities and incremental oil production. Dual pumping technology becomes of ever-more use today, since unified well-spacing pattern envisioned for multilayer fields development and operation ensures feasibility of multiple-zone production, and, as a consequence, ramp-up of reserves recovery and oil drainage amount as well. At the same time, practicability of multiple-zone production depends on a number of fraught factors and requires thereof appropriate inventory and current status analyses to be fulfilled with regard to reserves recovery operations. As influx performance study and fluid-bearing characteristic of reservoirs are often incomplete due to field situation, the authors, therefore, follows the task to carry out an efficiency analysis of multi-zone productions based on dual completion technologies. [Received: August 4, 2020; Accepted: August 21, 2021]